Product Center

current position: Home > Product Center > Mining anchor cable tensioning equipment
MQ series anchor cable tensioning equipment

MQ series anchor cable tensioning equipment

  • Category:Mining anchor cable tensioning equipment
  • Browse number:
  • QR code:
  • Release time:2023-06-27 14:03:14
  • Product description

The MQ18-250/63 and MQ15-180/50 anchor cable tensioning machines (pneumatic) are mainly used for the tensioning and quick installation of anchor cables. Composed of pre-stressed tensioning jacks, quick connectors, high-pressure oil pipes, oil pumps, etc. Applicable to Φ 15.24 Φ 18.9 Φ 21.6mm laser cable ensures that the anchor cable tension reaches the pre-stress index, and is an essential tool for the installation of staggered pre-stress tensioning in coal mine tunnels. It is an important tool for the successful installation of anchor cables. This product has a reasonable structure, reliable performance, simple operation, and safe use. TQ15-30065, TQ18-40070 Mine Anchor Cable Retractor (Manual Anchor Cable Tensioning Machine). When the manual hydraulic pump is replaced with a pneumatic hydraulic pump, it becomes a pneumatic laser cable tensioning machine. Note: When selecting the anchor release device, please confirm whether it is an open or perforated type, and the anchor release lock φ 15.2/ φ 18%/ Φ twenty-one point six

1、 Repairers of explosive devices must undergo technical training, hold valid certificates, and be familiar with the "Coal Mine Safety Regulations", "Coal Mine Mechanical and Electrical Equipment Maintenance Quality Standards", "Coal Mine Mechanical and Electrical Equipment Intactness Standards", and relevant standards and regulations for explosion-proof electrical equipment. 2、 Inspect and record the faults of the detonators that need to be repaired in this class, conduct regular performance parameter tests on the detonators, and master the structural performance and repair process of the detonators. 3、 When repairing the detonator, the capacitor should be fully discharged first, and then the components should be repaired or replaced. 4、 The replaced components should meet the requirements of the "Quality Standards for Maintenance of Coal Mine Mechanical and Electrical Equipment". 5、 Test the insulation resistance of the equipment and dry the affected equipment. 6、 It is strictly prohibited to conduct short circuit tests on two wiring terminals. To avoid damage to electrical components and equipment. 7、 After maintenance, the detonator must undergo a burst energy and discharge time test, and can only be used after passing the test. 8、 The repaired detonator must comply with the "Coal Mine Mechanical and Electrical Equipment Integrity Standards" and relevant standards and regulations for explosion-proof electrical equipment. 9、 Carefully fill out the maintenance records.

Tags

Recently Viewed:

183-4171-6060

Address: No. 88 West Outer Ring Road, Dashiqiao City, Liaoning Province

Website: www.mfd.com.cn